EDI 855 purchase order acknowledgment: codes and timing
An EDI 855 is a purchase order acknowledgment. A seller sends it back to a buyer after an order arrives, to say whether the order is accepted, changed or rejected. It is transaction set 855 in the X12 standard. The exact codes and deadlines come from each customer’s implementation guide, so get that guide before you build.
What is an EDI 855 purchase order acknowledgment?
The 855 is the reply to an EDI 850 purchase order. The Flxpoint 855 guide describes its job as to “confirm receipt of a Purchase Order (850) and communicate your intent to fulfill it — line by line.” In that setup there is one 855 per 850, and every PO needs one.
A Core-Mark guide published through SPS Commerce in 2024 adds that the set can also notify a buyer of an order the vendor generated itself. In practice, you will mostly send them in answer to a customer’s PO.
What goes in the header, and what do the BAK02 codes mean?
The header segment is called BAK. According to the Core-Mark guide, it carries:
- BAK01, the purpose of the transaction.
- BAK02, the acknowledgment type. This is the headline answer for the whole order.
- BAK03, the buyer’s purchase order number.
- BAK04, the date the buyer assigned to the PO.
- BAK09, the date you assigned to the acknowledgment.
The guide’s notes also define BAK08 as the seller’s order number.
Flxpoint’s 2026 guide warns that the PO number in BAK03 must match the 850 exactly. If it does not, the acknowledgment can be silently ignored by that system.
The full X12 list of BAK02 codes is long. Infor’s 2026.x EDI documentation lists 15 acknowledgment types, including these:
| Code | Name in Infor’s list |
|---|---|
| AC | Ack W Detail Change |
| AD | Ack W Detail No Change |
| AT | Accepted |
| RD | Reject With Detail |
| RJ | Reject No Detail |
| RO | Rejected With Counter Offer |
Partners use only a subset, and they define the subset differently. The Core-Mark guide uses AC, AD and RD. It says AD is used when all items are accepted, and then every line must be marked accepted. RD is used when all items are rejected, and then every line must be marked rejected. Flxpoint’s 2026 guide, by contrast, describes AD as “accepted as-is,” AC as accepted with changes and RD as rejected. Do not guess a code from memory. Use the one in your customer’s guide.
How does the 855 handle each line?
Each line starts with a PO1 segment that repeats the item and quantity from the order. An ACK segment follows it and gives the seller’s answer for that line. In the Core-Mark guide, ACK01 values include:
- IA: item accepted.
- IQ: accepted, quantity changed.
- IP: accepted, price changed.
- DR: accepted, date rescheduled.
- IB: backordered.
- IR: item rejected.
The same guide says that when the status is IQ, DR or IB, you must also send a quantity and unit. For DR and IB you must send a date as well. If the status is IP, the new net price goes in PO104.
What timing rules should you expect?
Customers set their own deadlines. Two examples from published guides:
- Flxpoint’s 2026 guide says to send the 855 within 24 hours of receiving the 850.
- Core-Mark says all orders must be acknowledged “within 48 hours (2 business days) of receipt.”
Both are set by the trading partner. Put each customer’s deadline in a table your team can see, and measure how often you meet it.
What mistakes cause an 855 to be rejected, and how do you avoid them?
Flxpoint’s 2026 guide names these errors:
- A PO number that does not match the 850.
- A line with no ACK. Flxpoint says this fails the whole file.
- Two ACK segments on one line.
- An acknowledged quantity higher than the ordered quantity in PO102.
- The wrong identifier qualifier in the PO1 segment, such as a part number sent under a qualifier the parser does not expect.
Business mistakes also happen. An order can be accepted in full at the header and then shipped short. A header code of “accepted” should never be sent before inventory and price have been checked.
To keep acknowledgments accurate:
- Collect the customer’s 855 guide first. Note the accepted codes, the deadline and which lines need dates.
- Check stock and price before you acknowledge. Changes should show up as IQ, IP or DR, not as a surprise at the ASN.
- Echo the order exactly. Copy the PO number and item identifiers from the 850.
- Send changes as changes. If something differs from the order, say so at line level.
- Track exceptions. Count rejected or corrected acknowledgments and why, then look at the pattern each month.
- Keep the chain consistent. The numbers in the 855 should still match the 856 advance ship notice and the invoice. The order to cash guide covers related measures.
Frequently asked questions
Is an 855 the same as an order confirmation?
They serve a similar purpose. An order confirmation is often an email or PDF. The 855 is the same idea in a standard electronic format that the buyer’s system can read.
Do I have to send an 855 for every order?
Only if your customer requires it. Both partner guides cited here do, and Core-Mark’s says suppliers must send one for each PO.
Where Dockmend fits
Dockmend is being built to help operations teams read incoming orders, check them against inventory and flag exceptions for a person to review, so acknowledgments are less likely to be keyed by hand. It is still being built, and we have not announced support for any EDI network or ERP. Join the waitlist
This guide is general information, not legal or compliance advice. EDI codes and deadlines vary by trading partner, version and implementation guide, so check your partner’s before you build or change anything.