All guides

EDI 860 purchase order change: what it is and how to handle it

An EDI 860 is a purchase order change request. A buyer sends it to change an order that was already sent as an EDI 850, for example to cut a quantity, move a date or cancel a line. It is transaction set 860 in the X12 standard. Your customer’s implementation guide decides which change types you must accept, so read it before you build anything.

What is an EDI 860 purchase order change?

The 860 changes an earlier order. Stedi’s X12 5010 reference says it can be used “by a buyer to request a change to a previously submitted purchase order.” It gives an example: a retailer orders 100 units of a SKU in an 850, then reduces the order to 10 units by sending an 860. The same page says X12 Release 5010 dates from 2004.

There is a second use. Walmart’s supplier documentation, last updated in April 2026, says a buyer can also use the set “to confirm acceptance of a change initiated by the seller or by mutual agreement of the two parties.” So an 860 is not always a surprise. It can be the buyer agreeing to something you asked for.

What segments are in an 860?

The set follows the usual X12 pattern of a header, a detail area and a summary. Based on the Walmart and IBM documentation:

Segment Where What it does
ST Header Starts the transaction set and gives it a control number.
BCH Header Begins the change. Carries the original PO number and a date.
POC Detail Describes the change to one line item.
CTT Summary Counts the line items, which is the number of POC segments.
SE Summary Ends the set and gives the segment count.

IBM’s documentation also lists optional header segments for dates (DTM) and names and addresses (N1, N3, N4), limited in its setup to ship-to and bill-to parties. Which optional segments you get depends on the customer.

What do the BCH and POC fields mean?

In the BCH segment, Walmart’s page says BCH03 holds the original PO number, taken from BEG03 of the 850. Match it exactly. A change that points to the wrong PO number cannot be applied.

IBM’s reference explains what BCH01 does in its implementation:

  • 01 means the PO is canceled.
  • 04 means the PO is changed by line item.
  • 05 means the original PO is replaced.
  • 06 means the buyer is acknowledging a change message from the seller, which is the 865.

Walmart’s page lists only code 00, “Original,” so a retailer may use a much smaller set than IBM shows.

In the POC segment, IBM says POC01 “is the line number from the original purchase order.” POC02 is the change or response type code, and it is required. IBM’s page names codes such as AI (add item), CA, DI, PQ, QC, QD and QI, but does not define every one, so take their meanings from your partner’s guide. On quantity changes, IBM says POC04 is the new quantity for CA, PQ or QC, and POC06, the unit price, is mandatory when POC02 relates to a quantity change.

What does a simple 860 look like?

Walmart’s page includes a sample file that cancels a line. The sample is dated 2009 and is only a reference:

BCH*00*DS*12845747***20091104
POC*0001*DI******PL*1
CTT*1

Here DI means “Deleted Items.” Walmart’s page says to assume the line’s entire quantity will be canceled. The CTT line says there is one POC segment. This is a retailer-specific layout, so another customer’s file will look different.

How should you handle changes safely?

A change is risky because the order may already be moving. Some steps that help:

  1. Find the original order first. Match the BCH PO number to an 850 you have received. If you cannot find it, flag it, do not guess.
  2. Compare before you overwrite. Show the old and new quantity, price and date side by side so a person can see what moved.
  3. Check where the order is. If it has been picked or shipped, a cancel may be impossible. Decide who can approve that exception.
  4. Respond in the way your customer expects. Some partners may want an acknowledgment of the change, such as a fresh 855 purchase order acknowledgment. Check the guide.
  5. Keep the chain consistent. The 856 advance ship notice and the invoice should reflect the changed order, not the original.
  6. Log every change. Count changes by customer and by reason. A customer that changes many orders may need a different lead time.

Frequently asked questions

Is an 860 the same as an 865?

No. They are related. IBM’s documentation describes the 860 as the buyer’s change and the 865 as the seller’s change message, and BCH01 code 06 lets a buyer acknowledge an 865. The seller-initiated side is the 865.

Do I need to support the 860?

Only if a customer requires it. Ask each customer for its guide early, so you know which change types it will send and how it expects you to respond before the first change arrives.

Where Dockmend fits

Dockmend is being built to help operations teams spot when an incoming change touches an order already in progress, and flag it for a person to review. It is still being built, and we have not announced support for any EDI network or ERP. Join the waitlist

This guide is general information, not legal or compliance advice. EDI codes and requirements vary by trading partner, version and implementation guide, so check your partner’s before you build or change anything.